Metal Roof Panels
 

Metal Wall Panels
 

Trim Specialties
 

Distribution Materials
 


 
   MRS System 1000



   
 
  • Ideal for light commercial or residential applications
  • Snap-Lock design allows for installation efficiency and water-tight protection
  • Allows application over solid substrate
  • Can be formed using 22/24 gauge steel, 16 oz copper, and .032 aluminum
 
Technical Data
Flashing Details
Finish Warranty
Watertightness Warranty
Color Chart
 
 

Product Overview
MRS System 1000, a high performance cost-effective standing seam panel, it is most common among residential and light commmerical applications. MRS System 1000, with concealed fasteners/clips, requires no mechanical seaming or seam cap. Striations and stiffening ribs are recommended in order to reduce oil-canning.

Materials
12" to 20" O.C.
22/24 ga.
.032 aluminum
16 oz. Copper

Panel Features
Flat/Smooth
Striations
Stress/Stiffening Ribs


Requirements
Panel can be installed on Solid Substrate
Clips spaced at 20" O.C. Max (2 Fasteners per Clip)
30# Felt or Ice & Water Shield
Minimum Roof Pitch: 3" on 12"

Finish
Kynar 500® or Hylar 5000®
Two-Coat Fluropolymer (BASF)

  LEED Credits

LEED
If applicable Metal Roofing Systems, Inc. can provide LEED Information when requested. For information on state and local tax initiatives, please go to USGBC Government Resources page.

LEED: SS Credit 7.2 Heat Island Effect: Roof
Requirement: Roofing materials having a Solar Reflectance Index (SRI) equal to or greater than the values below for a minimum of 75% of the roof surface.

Low-Sloped Roof (<=2:12): SRI must be >= 78% (2 colors available)
Steep-Sloped Roof (>=2:12): SRI must be >= 29% (29 or more colors available)

LEED: MR Credit 4.1 Recycled Content
Our material contains the following recycled content:

Galvanized Steel: Recycled scrap represents some 31% of the finished product.
23% of this is Post-Consumer
8% of this is Pre-Consumer

Aluminum Products: Recycled scrap represents some 88% of the finished product.
35% of this is Post-Consumer
53% of this is Pre-Consumer

LEED: MR Credit 5.1 Regional Materials
To qualify the materials being used on the building must have been extracted, havested, or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% of the total materials value.

Please contact Metal Roofing Systems to find out if your project will qualify for this LEED credit.

 

 
     

     



 

 
© 2009 Metal Roofing Systems